About this deal
Perfectly chilled: beer monster beer keg keeps your beverages chilled down to a cool 2 degrees with our supreme integrated cooling system. Built to last - because it's built with materials like corrosion-resistant zinc and a durable matte finish, the draftpour is a cinch to keep clean and will look gorgeous for years to come-pour after beautiful pour.
Petra Draft Beer Dispenser *Petra Draft Beer Dispenser
Complete with a removable drip dray to help prevent spills; this home draught machine is perfect for drinks any social occasion. A reference to a statute or statutory provision is a reference to such statute or provision as amended or re-enacted. A reference to a statute or statutory provision includes any subordinate legislation made under that statute or statutory provision, as amended or re-enacted. Want to brew and drink an ale that Bilbo Baggins and Co would be happy with? Then look no further than the Pinter 2, a proper barrel of fun (and alcohol) to elevate your session with mates.
The Buyer shall pay all amounts due under the Contract in full without any set-off, counterclaim, deduction or withholding (except for any deduction or withholding required by law). The Agent may at any time, without limiting any other rights or remedies it may have, set off any amount owing to it by the Buyer against any amount payable by the Agent to the Buyer. This draught beer tap is compatible with any universal pre and non-carbonated 5-litre kegs; available online and in supermarkets. the price offered by the Buyer at the fall of the hammer in a sale by public or online auction; and he will ensure the safe handling and disposal of any oils, lubricants, fluids, chemicals, or waste in accordance with all current legislation, rules, and regulations. Fresher for longer: beer monster keeps your drinks fresh for up-to 30 days for cool, fresh beer whenever you fancy it.
Petra Beer Dispenser Tap Integrated Cooling (2NDS/damaged Petra Beer Dispenser Tap Integrated Cooling (2NDS/damaged
Please ensure you bring sufficient manpower to collect lots as we will be unable to assist in loading. If any provision or part-provision of this agreement is invalid, illegal, or unenforceable, the parties shall negotiate in good faith to amend such provision so that, as amended, it is legal, valid and enforceable, and, to the greatest extent possible, achieves the intended commercial result of the original provision.collection of the Lots shall be deemed to have been completed by close of business (5pm UK time) on the day of the Collection Deadline; and