About this deal
The design of the SBC is based on reference projects and is aligned with leading operators on shaft sinking activities. Each SBC is tailored to the specific requirements of the project to ensure the maximum support for safe and fast shaft sinking in each construction phase. Although on the SBC work steps are carried out in parallel, the machine concept significantly increases worker safety compared to conventional shaft sinking. During the excavation, personnel are not exposed to the unlined shaft wall.
Great Deal
Free UK shipping. 15 day free returns.
Community Updates