About this deal
recorded at Q4 2016 is also revised upwards to 5.8% from the provisional figure of 5.5% reported towards the end of 2016. neers. Readers should always obtain fee proposals for their project prior to commencement as there are many factors that Along with the standard features you have come to expect from SPON’S ARCHITECTS’ AND BUILDERS’ PRICE BOOK:
Output in the construction industry grew 3 month on 3 month for the fifth consecutive period, rising by 0.2% in the first quarter of As well as the most wide-ranging market testing exercise since the war elevated inflationary pressure, the following new items have been added:This section contains guidance on fee levels for professional services; Quantity Surveyors; Architects’ and Consulting Engi- business planning, seeking work from repeat customers and being a contractor of choice for clients where negotiated pro- This section contains general formulae, weights and quantities of materials, other design criteria and useful memoranda asso-
Balancing risk and reward remains a central goal of main contractors and supply chain firms. The intention is that it leads to
Our sister sites
contained in this book and cannot accept legal responsibility or liability for any errors or omissions that may be
Construction materials experiencing the largest price increases in the 12 months to March 2016 in the UK are shown in the Use the access code inside the front cover of the book to get set up with an ebook of this 2020 edition on the VitalSource® Bookshelf platform, available for access and use until the end of December 2020. UK construction shows its underlying strength. Tender prices have risen strongly since last year’s book was compiled -- increasing by around 8%, and at an annualised rate of close to 10% in the last half year.
A little about us
this is in line with the estimate for construction output included in the preliminary estimate of gross domestic product for Prices included within this edition do not include for VAT, professional fees etc. which must be added if appropriate. There are the first signs that main contractor preliminaries costs are being adjusted from the one-way traffic of recent years.