276°
Posted 20 hours ago

Umbra Magino Stool with Intergral Magazine Rack, Clear, H 42cm, B 43cm, L 29cm

£9.9£99Clearance
ZTS2023's avatar
Shared by
ZTS2023
Joined in 2023
82
63

About this deal

Production during the third quarter measured 53,911 gold ounces, including pre-commercial production of 10,693 ounces. Magino is a long life, low cost mine in an outstanding mining jurisdiction. This debt financing arrangement, alongside the proposed equity financing, will put Argonaut Gold in a strong financial position to complete the Magino project and move it forward into production by the end of Q1 2023,” said president and CEO Larry Radford. Ontario, operating as LET’S ROLL ‘IDEATION’ CONSULTING (LRIC), was engaged to provide catering and cleaning services for the accommodation camp. There are several kinds of armoured cloches. Cloches are non-retractable turrets. The word cloche is a French term meaning bell due to its shape. All cloches were made of alloy steel. The project has total proven and probable reserves of 59-million ounces grading 1.13 g/t gold. A feasibility study on the project has identified it as a strategic, long-life asset.

Since the beginning of the fourth quarter, Magino's throughput has been averaging 9,200 tonnes per day, in-line with nameplate capacity. As we continue to ramp up, we are focused on driving mining productivity, mill optimization, and further advancing the plant expansion that has the potential to increase throughput to annual production above 200,000 ounces per year for the life of mine," said Marc Leduc, Chief Operating Officer of Argonaut Gold. Dore Copper Mining Brief: Providing an Update on its project activities located near Chibougamau, Quebec TORONTO, March 30, 2023 /CNW/ - Argonaut Gold Inc. (TSX: AR) (the "Company", "Argonaut Gold" or "Argonaut"), is pleased to announce today a significant increase in Mineral Resources for the Company's two principal assets: the Magino Project, in the final stages of construction, located in Ontario, Canada, and the Florida Canyon Mine located in Nevada, USA. Measured and Indicated Mineral Resources at the Company's two principal assets increased by 14% to 5.7 million gold ounces, while Inferred Mineral Resources more than quadrupled to 3.0 million gold ounces. On a consolidated basis, Measured and Indicated Mineral Resources total 11.3 million gold ounces, Inferred Mineral Resources total 3.5 million gold ounces, and Proven and Probable Mineral Reserves total 5.6 million gold ounces effective December 31, 2022. Magino is parked just to the west of Alamo Gold’s prolific Island Gold underground mine, now undergoing a third phase of expansion. Romanych, Marc; Rupp, Martin (2010). Maginot Line 1940: Battles on the French Frontier. Oxford: Osprey. ISBN 978-1-84603-499-2.

From Our Partners

There are 75 LG cloches ( lance-grenade or "grenade launcher") on the line. Those cloches are almost completely covered by concrete, with only a small hole to launch grenades through for local defence. At Florida Canyon, Argonaut will also start a drill programme as part of a proof-of-concept programme on the sulphide material. The conference call replay will be available from 12:00 p.m. ET on November 14, 2023 until 11:59 p.m. ET on November 21, 2023. Nichols, Kenneth D. (1987). The Road to Trinity: A Personal Account of How America's Nuclear Policies Were Made. New York: William Morrow and Company. ISBN 0-688-06910-X. Zaloga, Steven (2010). Operation Nordwind 1945: Hitler's Last Offensive in the West. Osprey. ISBN 978-1-84603-683-5.

The company also has three operating mines including the Florida Canyon mine in Nevada, USA, where it is pursuing potential for redevelopment and additional growth, La Colorada mine in Sonora, Mexico and San Agustin mine in Durango, Mexico. The plant has been largely operating at nameplate capacity since the beginning of the quarter," he said.The defences were first proposed by Marshal Joseph Joffre. He was opposed by modernists such as Paul Reynaud and Charles de Gaulle, who favoured investment in armour and aircraft. Joffre had support from Marshal Henri Philippe Pétain, and the government organised many reports and commissions. André Maginot finally convinced the government to invest in the scheme. Maginot was another veteran of World War I; he became the French Minister of Veteran Affairs and then Minister of War (1928–1932). Award Winning Design: Magino Acrylic Stool was designed by Karim Rashid and won a Housewares Design Award in 2006 – there are many copies, but this is the original design made for Umbra Get all the essential market news and expert opinions in one place with our daily newsletter. Receive a comprehensive recap of the day's top stories directly to your inbox. Sign up here!

Argonaut envisions a two-year construction period, with first gold production at Magino expected to start during the first half of 2023. Forward-looking statements are necessarily based on the opinions and estimates of management at the date the statements are made and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Many of these assumptions are based on factors and events that are not within the control of Argonaut and there is no assurance they will prove to be correct.

Reagan's budgetary Maginot Line". The New York Times. 13 February 1985 . Retrieved 23 February 2023. Envisaged is a 115 700 oz/y gold operation with a 17-year mine life. Average gold production of 150 000 oz/y is expected over the first five years. Ouvrage Rochonvillers was retained by the French Army as a command centre into the 1990s but was deactivated following the disappearance of the Soviet threat. Ouvrage Hochwald is the only facility in the main line that remains in active service as a hardened command facility for the French Air Force known as Drachenbronn Airbase. Magino is regarded as Argonaut’s flagship operation as its largest and its first Canadian operation. The company runs three other mines in Nevada and two in Mexico at Durango and Sonora.

Certain information contained or incorporated by reference in this press release, including any information as to our strategy, projects or future financial or operating performance, constitutes "forward-looking statements". Forward-looking statements are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may", "should" or "will" occur. This press release contains forward-looking statements and forward-looking information including, but not limited to: Magino becoming one of the largest and lowest cost Canadian gold mines, the likelihood of success of the Magino reserve development drilling program to increase reserves, the likelihood of the engineering studies to increase mill throughput, organic growth through mineral resource expansion delivering significant value, the Company becoming a low-cost, mid-tier North American gold producer, the Company achieving its full year 2023 production and cost guidance, the Magino mill achieving crushing and grinding circuit throughput targets, completion of mining the current reserve base at San Agustin, optimizing the value of the Mexican assets, Magino production increasing, Magino costs including consolidated cost of sales per ounce, cash cost per ounce, and all-in sustaining cost per ounce decreasing, and the exploration cost being greater than original guidance. The initial mine life is tabbed at 19 years but Argonaut believes there’s more gold resources beneath the pit and to the east and west. The Board of Directors and Management would like to thank the Magino team for their hard work to achieve the commercial production milestone and celebrate the dedication of all employees, contractors, and community partners that have supported construction of the newest gold mine in Canada as we work to achieve our vision of becoming a low-cost, mid-tier North American gold producer that delivers value to all stakeholders," stated Richard Young, President and Chief Executive Officer. The Magino mine achieved commercial production on November 1, 2023. Plant throughput has averaged 9,200 tonnes per day since the beginning of the fourth quarter, with tonnes per operating hour ("TPOH") in-line with nameplate capacity.

Featured Local Savings

Ausenco Engineering Canada (Ausenco) signed a contract in January 2021 to provide engineering, procurement, construction and commissioning services for the Magino processing facility and other parts of the Magino construction project.

Asda Great Deal

Free UK shipping. 15 day free returns.
Community Updates
*So you can easily identify outgoing links on our site, we've marked them with an "*" symbol. Links on our site are monetised, but this never affects which deals get posted. Find more info in our FAQs and About Us page.
New Comment